Past Projects

Past projects

Building Turbines, Inc. - BTI Phase III Project

BTI Phase III Project - Spring 2012

This project was run concurrently with the Phase II Project and the AGEG and UT teams collaborated the whole semester on both projects.

The goal of the Phase III UT ME Capstone Project team is to build upon the previous semester’s work and collaborate with the Phase II team to thoroughly reverse engineer one existing (best) design and create a 3D CAD SolidWorks model incorporating finite element analysis which is ultimately suitable for creation of a solid scale model suitable for wind-tunnel testing.  The CAD model should address system dynamics, locate frame & fabric stress points at high wind speeds, assess main shaft loading & torsion, calculate moments of inertia and bearing loads and determine potential speed related harmonic instabilities.

  •  Start 
  •  Prev 
  •  Next 
  •  End 

Page 1 of 4

AGEG Membership

Support AGEG

With Your Tax Deductible Donation.

Proud Member

tv izle tv izle tv izle tv izle tv izle tv izle tv izle tv izle tv izle tv izle tv izle radyo dinle radyo dinle radyo dinle radyo dinle radyo dinle radyo dinle radyo dinle radyo dinle radyo dinle radyo dinle